Barelang Bridge, Barelang, Indonesia.
VSL INDONESIA involved in four bridges including Batam-Tonton cable-stayed bridge with VSL scope of work: Post-tensioning, Form traveller supply and operation, Climbform for pylon construction, Stay Cable supply and installation. 1997

Cawang-Tanjung Priok Toll Road, Jakarta.  Precast multi span simple beam bridge.
VSL scop of work: Post-tensioning, Launching Gantry supply and Girder Erection. 1996

Wisma Tugu Pratama, Jakarta
Post-tensioing the beams. Design, supply and installation of 60 tonnes of PT beams and tie beams at 5 storeys tower block & single storey basement. The exterior columns are inclined 65 degrees. 1998

City Lofts, Jakarta
PT Slab (unbonded). 2006

Menara Peninsula, Jakarta
PT transfer slab. 1997

Paris Van Java, Bandung.
Large area (3000m2 per floor, 9500m2 total) prestressed concrete slab with steel deck. 2005

Bogor Trade Mall, Bogor
PT slab (bonded). 2005

Hanggar Garuda, Jakarta
Heavy Lifting


Pasupati Bridge, Bandung .
Precast segmental balanced cantilever bridge. Post-tensioning, gantry operation (erection). 2005


Sudirman Flyover, Jakarta.
Incremental Launching Method (ILM)


Dukuh Atas under pass, Jakarta.
Concrete box jacking. 1995

Services & Products
Ground Anchors
Retained Earth
Repair & Strengthening
Heavy Lifting
Climbform & Slipform
Stay Cables
Bridge Erection
Incremental Launching
Bearing & Joints
Design & Engineering

Photo, presentation, video, paper, report, etc.

© 2007 Design & Publishing by VSL Indonesia