Barelang
Bridge,
Barelang, Indonesia.
VSL
INDONESIA involved in four bridges including Batam-Tonton cable-stayed
bridge with VSL scope of work: Post-tensioning, Form traveller supply
and operation, Climbform for pylon construction, Stay Cable supply and
installation. 1997
|
 |
Cawang-Tanjung
Priok Toll Road,
Jakarta. Precast
multi span simple beam bridge.
VSL scop of work: Post-tensioning, Launching Gantry supply and Girder
Erection. 1996 |
 |
Wisma Tugu Pratama, Jakarta
Post-tensioing the beams. Design, supply and installation of 60 tonnes
of PT beams and tie beams at 5 storeys tower block & single
storey basement. The exterior columns are inclined 65 degrees. 1998 |
 |
City
Lofts, Jakarta
PT Slab (unbonded). 2006 |
 |
Menara Peninsula, Jakarta
PT
transfer slab. 1997 |
 |
Paris Van
Java, Bandung.
Large
area (3000m2 per floor, 9500m2 total)
prestressed concrete slab
with steel deck. 2005
|
 |
Bogor Trade Mall, Bogor
PT slab (bonded). 2005 |
 |
Hanggar Garuda, Jakarta
Heavy
Lifting
|
 |
Pasupati Bridge, Bandung
.
Precast segmental balanced cantilever bridge. Post-tensioning,
gantry operation (erection). 2005
|
 |
Sudirman Flyover, Jakarta.
Incremental Launching Method (ILM)
|
 |
Dukuh Atas under pass, Jakarta.
Concrete
box jacking. 1995 |
 |
|
|
|
|